Alcatel Bts Installation And Commissioning Pdf

Alcatel MW Software Installation & Commissioning - Download as Powerpoint Presentation (.ppt /.pptx), PDF File (.pdf), Text File (.txt) or view presentation slides online. Alcatel MW Software Installation & Commissioning.

Malayalam movies 2018 free download sites. Dvdplay is my best Malayalam movies download sites. 10# dvdplay.fun is another good name for download HD Malayalam movies.

TX output power & Combiner loss (dBm) Low –loss configuration (Non Combine) Combine Configuration Standard MP Configuration MP Power 45.44dBm / 35W ====> ANCD Non-Combine (-0.95dBm) ===> 44.4dBm / 27.5W MP Power 45.44dBm / 35W ====> ANCD Combine (-4.4dBm) ===> 41.0dBm / 12.5W MP Power 45.44dBm / 35W ====> ANY (-3.3dBm) ANCD Combine (-4.4dBm) ===> 37.5dBm / 5.6W No-Double Ant Solution No.MP TRX per sector 1 TRE 2 TRE 3 TRE 4 TRE 5 TRE 6 TRE 7 TRE 8 TRE No.

Alcatel bts installation and commissioning pdf download

Bts commissioning (alcatel lucent) • 1. Switch OFF the BTS cabinet and disconnect Abis connectors fromDDF before offline start • Disconnect the Abis connectorfrom The DDF • Switch ON the BTS cabinet breakers and connect the Laptop with BTS • User Name “COMMTE” Password“COMMTE” • Communication Port setting • OR • After connecting this windowwill be appear • Go toConfiguration-> BTS-SW Download-> to download BTS software • After BTS- SW downloadthis window will appear • Go to offlineFiles and select First File of Master File.

Commissioning

• Go to offlineFiles and select First File of DDL file. • Click ok to startdownloading SW • BTS software starts to download. • All these Files aredownloaded • Go toConfiguration BTScommissioning • Click startcommissioning • Edit Qmux Address • Edit sector Mapping • Check AllTwin TRE’s. • Click EndCommissioning Click > Hardware setting>>BeginHW modification • Go to configuration> BTS commissioning Go to start commissioning> Edit Q1Address, Edit SectorMapping and Twin TRA setting as in offline. • Go toconfiguration> Hardware setting>“EndModification” to end onlinecommissioning • Online commissioning steps Connect the Abis connector at DDF by verifying Tx/Rx cable properly. OML will be established after primary Abis has connected to DDF. Give hard reset to BTS after OML has established. Put site on Downloading from OMC. O&M will be established as downloading completes. Connect Laptop to BTS MMI port. Go to configuration>Hardware setting>Begin Hardware modification. • Online commissioning steps Go to configuration>BTS commissioning>start commissioning. Edit Qmux Address Edit sector mapping Check all Twin TRA setting. Click end commissioning and shift all modules from selected modules to available modules. Go to configuration>Hardware setting>End Hardware modification. Click “yes” when an automatically hardware modification window appears. Hw Audit will be run and all Hardware will be shown after sometime. • ON Line Commissioning Completed Successfully.

• Software components combiner Fan UnitHardwareShown insoftware window Tre’s clock Alarm card • Alarmswindow • Transceivers Shown in window • Transceivers Types Four type of Transceivers in Alcatel Equipment TRAGE>Gsm Single TRE TRADE>Dcs single TRE TGT09>Gsm Twin TRE TGT18>DCS Twin TRE TAGHE>High power TRE • VSWRShown in window • Sectors ShownIn window • Station units • BSC SBLs(security block levels)BTS OM & Sectors.Sec RSLs can be unlock from local Terminal. • Troubleshooting If a TRE or combiner is in “Not Operational” or “FOS” state then disable it then initialize it by using “init” command. If TRE or combiner can not operational by doing above command then remove it by using the following method. Go to configuration>>Hardware setting>>Begin HW modification. Go to Configuration>>Hardware setting>>Remove. Remove the Hardware from BTS. Window will be appear of Hardware removal, select the module to remove. Go to Configuration>>Hardware setting>>End Modification. Click ”yes” when configuration changes window appears.