Hb Smith G200 Manual Woodworkers
I have A HB Smith. I have A HB Smith model G-100 w9 hsid boiler 92 year model ser b92 2517 with white rogers 50e47-843 controller m271135. System runs for A few hours then burner quits electric water pumps continue running and white rogers controller led shows flashing red. Hb Smith G200 Boiler Manual Hb Smith G200 Manually Hb smith boiler parts. View and Download Smith Cast Iron Boilers Series 28A installation and operating instructions manual. Smith GB100-W-Anything Constant Pilot Ignition. Firedragon Member Posts: 1,436. December 2004 in THE MAIN WALL. Hb smith might have had the holder off a bit.
• Installation and service must be performed by a qualified installer, service agency or the gas supplier. INSTALLER, THESE INSTRUCTIONS TO BE AFFIXED ADJACENT TO THE BOILER. CONSUMER, RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE PURPOSES. FOR JACKET ASSEMBLY AND BURNER SET UP SEE SEPARATE INSTRUCTIONS. • Health Warnings. Back cover BEFORE YOU START This manual covers the assembly, installation, operation and maintenance of a Series 28A low pressure steam or hot water boiler.
The 28A Series boilers are supplied completely knocked down for field assembly, knocked down but with an assembled block or as complete factory assembled packaged boilers. • SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS Figure 1- Service Clearances to Adjacent Construction WARNING: Never install a 28A boiler on top of combustible flooring without consulting the local building authorities for proper installation guidelines! A minimum clearance of 6 in, 0.15 m must be maintained between the boiler. • Page 4 SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS All Air From Inside The Building If the boiler is to be located in a confined space mini- mum clearances of 24 in, 610 mm must be maintained between the boiler and any adjacent construction. When installed in a confined space, two permanent openings communicating with an additional room(s) are required. • SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS Chimney Inspection & Sizing If this boiler will be connected to a masonry chimney, a thorough inspection of the chimney must be performed. Ensure that the chimney is clean, properly constructed, lined and properly sized, see Figure 2.
Table 2 lists the equivalent breeching and flue sizes required for the 28A boilers. • Page 6 SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS VENT CONNECTIONS WARNING: Never modify or alter any part of the boiler’s smoke hood. This includes the removal or alteration of any baffles. Download naruto hokage ke 3 vs orochimaru. Never install a vent pipe of a diameter different than that of the boiler smoke hood outlet.
• SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS c) Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. • Page 8 SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS Completed boilers must be tested as follows: Steam Boilers – the assembled boiler sections shall be subjected to a hydrostatic test pressure of not less than 45 psig, 315 kPa. • SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS 5. Insert the large port connector with its steel inner ring into the upper port. Insert the two round port connectors into the lower ports. NOTE: Apply the spray adhesive supplied with the boiler to the port recess to hold the port connector in place if necessary.